WATER LINE NETWORK
HAIL CEMENT FACTORY - TURBA
The scope of this project is to execute the new underground water line network within the factory boundary, that is located in Turba, Hail City.
Two types of piping are being used: HDPE pipes network with a total length of 15,00 L.M, and aboveground seamless carbon steel to for final terminations.
The network provides five different water functions: cooling, return, potable, raw, spray and firefighting water.
The scope includes the execution of chamber rooms, terminations of the existing network, supplying of fire hydrants and all of the network valves.
The duration of the project is (7) months and is to be handed-over in February 2018.